Condition of preceding work
The readiness of plaster, floors, openings and concealed works determines preparation and repair needs.

We organise finishing materials and trades around actual site conditions, architectural details and the correct work sequence.
Finishing & Fit-Out
Finishing brings together plastering, painting, flooring, wall cladding, ceilings, joinery, aluminium, glass and metalwork. The quality of the result depends on resolved details, suitable substrates and the right sequence between trades before surfaces are closed or final items installed.
We review the space, required finish level, proposed materials and interfaces between items. The scope may be an integrated package or selected activities depending on the condition of the project and what has already been completed.
Surfaces, dimensions, preceding work, drawings and required details are reviewed.
Selections affecting dimensions, colours, edges and lead times are resolved before dependent work.
Work moves from preparation to final installation in an order that reduces clashes and rework.
Surfaces, alignment and finishes are checked and in-scope observations addressed before handover.
Finishing is not one uniform rate per square metre. The intended result, existing surfaces and material mix change the workload. Key factors include:
The readiness of plaster, floors, openings and concealed works determines preparation and repair needs.
Layered ceilings, special cladding and precise junctions require more coordination and installation time.
Sizes, finishes, installation methods and lead times vary significantly between products.
Ceilings, walls and joinery often depend on coordinated electrical and mechanical work.
Changing a design or product after preparation may affect related work or require a new order.
Yes, a selected scope such as flooring, painting or ceilings can be assessed, as can a broader package. Separation depends on site condition and interfaces with other work.
The scope can include reviewing selections and coordinating samples and supply for agreed materials, with purchasing and approval responsibilities stated in the proposal.
Not every item, but products affecting dimensions, concealed work or long lead times should be resolved before their dependent activities.
Clear drawings, timely sample approval, planned procurement and avoiding late changes help trades continue without unplanned stops.
Upgrading existing buildings and spaces after assessing their condition and defining what needs repair or replacement.
View serviceProgramme, material and trade coordination with on-site follow-up linking execution stages to quality and handover.
View serviceUnderstand the main drivers of finishing cost, including existing condition, scope, materials, detailing, procurement, programme, and changes.
Read guideA structured checklist for reviewing documents, finishes, openings, services, wet areas, and observations before project handover.
Read guide
Send the space drawings or current-condition photos and the materials you are considering so we can review the delivery requirements.